Apr 18, 2014 | Case Studies, Electrical, Mechanical
Total Construction Value*: $3,500,000 General: Mechanical & electrical design to replace a 600 psig steam boiler with a 1,200 HP 125 psig steam boiler. Work included installation of boiler, feedwater pumps, economizer, stack and electrical power equipment....
Apr 11, 2014 | Case Studies, Electrical, Fire Protection, Mechanical, Plumbing
KA Construction Value*: $2,000,000 est. General: Complete renovation of a historic building at the Naval War College. The work included renovating the sprinkler, plumbing, mechanical and electrical systems. *Construction values are based on Kuegler Associates portion...
Apr 4, 2014 | Case Studies, Electrical, Fire Protection, Mechanical, Plumbing
KA Construction Value*: $4,800,000, Area: 105,000 SF General: Complete fire protection, plumbing, mechanical and electrical renovation of a 4 story office building with attached gymnasium. The navy requires design analysis with detailed construction cost estimates....
Mar 28, 2014 | Case Studies, Electrical, Fire Protection, Mechanical, Plumbing
KA Construction Value*: $2,000,000.00 General: Complete mechanical renovation and selected plumbing, fire protection and electrical renovations of a 3 story classroom building. *Construction values are based on Kuegler Associates portion of the...
Mar 14, 2014 | Case Studies, Electrical, Fire Protection, Mechanical, Plumbing
KA Construction Value*: $550,000 Area: 10,000 SF General: Complete renovation of the existing surgical intensive care unit (SICU). Work included reconfiguring common spaces, replacing patient room head walls, installing new nurses station, and providing isolation...
Feb 28, 2014 | Case Studies, Electrical, Fire Protection, Mechanical, Plumbing
Plumbing, fire protection, mechanical and electrical design for a 14,000 SF addition for an aerospace manufacturer which is currently under construction. The addition will house large Class 1000 and Class 10,000 clean rooms. Work also includes design of in-house...