Kuegler Associates: Consulting Engineers - Designed Right = Built Right

High Voltage Distribution UpgradeComplete replacement of the university’s campus high voltage underground cable system.  Upgrade included redesign of radial network to a looped network utilizing existing underground duct system.  The addition of 9 High voltage SF6 gas loop switches and approximately 2 miles of 3 phase 15KV cable.  Construction valued at $3,000,000.